Laserfiche WebLink
ROADARLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Cat 637G $296.56 1 $296.56 $296.56 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $296.56 $296.56 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Pueblo <br />Transportation Cycle Time : Non- Total one-way travel distance : 2.0 miles <br /> Roadable Roadable Average travel speed : 40.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.05 0.05 Total non-roadable mob/demob cost $717.78 <br />Return time (hours) = 0.05 0.05 'two round trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost ** : $29.66 <br />Unloading time (hours) = 1.00 NA •• one round trip, no haul rig <br />Subtotals = 2.10 0.10 <br /> <br />............. <br />JOB TIME AND COST ........................... ................................ .............................................................................................. <br />Total job time : ........ ......... <br />4.20 hours <br /> Total job cost : $747