My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-19_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2010-05-19_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:10 PM
Creation date
5/19/2010 3:10:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
REVISION
Doc Date
5/19/2010
Doc Name
Bond Release Application
From
J. E. Stover & Associates, Inc
To
DRMS
Type & Sequence
SL6
Email Name
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNOWCAP COAL COMPANY <br />PHASE II & III BOND RELEASE <br />SOUTH PORTAL INDUSTRIAL ACREAGES <br />COST SUMMARY <br />DRMS DRMS TOTAL <br />TASK # TASK HRS DESCRIPTION JOB COST (DRMS Est) <br />019 1.07 Haul TS & OB from Lwr Prk Area to RSRDA (See Note 1) $836.85 <br />039 1.10 Rip/Scarify SP & UTL prior to Topsoil Replacement(See Note 2) $713.48 <br />092 22.60 Excavate Portal Area for New Drainage (See Note 3) $2,159.50 <br />093 4.9 Rip Rap Area for New Drainage (See Note 3) $19,342.40 <br />099 12.96 Move Topsoil from BA to Roadside Areas (See Note 4) $10,105.92 <br />100 0.95 Replace Topsoil at BA (See Note 4) $741.24 <br />132 15.05 Broadcast Seed Upland Seed Mix on Steep Areas (See Note 5) $19,908.30 <br />TOTAL 58.64 $53,807.69 <br />Note 1: Task 19 included Hauling Topsoil & Overburden in same task description. Overburden dollars <br />were released with SL-4, 21% of remaining amount (% representing top of pile) to be released is for Topsoil. <br />Note 2: Task 39 included South Portal Area and UTL area. Based on Table 14-2 of the permit <br />the South Portal acreage would be 17.2% of task and 58% of that is located in the Industrial <br />portion of the South Portal. <br />Note 3: Tasks 92 & 93 refer to drainage channel sections C and F. Section C (241', as shown on appendix pg <br />14-6-10, = 30% of task) has not been built, therefore, SCC is only asking for 70% of task be released. <br />Note 4: Task 99 and 100 dollars are based on 58% of total (Industrial portion of SP acreage is <br />estimated to be 58%) <br />Note 5: Task 132- Industrial acreage requested for release in this application is 14.8 acres. Seeding for <br />7.5 of these acres were released with SL-4. The remaining 7.3 acres that are included in this <br />application were broadcast seeded. <br />SL-6 5/10
The URL can be used to link to this page
Your browser does not support the video tag.