My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-14_REPORT - C1980006
DRMS
>
Day Forward
>
Report
>
Coal
>
C1980006
>
2010-05-14_REPORT - C1980006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:02 PM
Creation date
5/17/2010 8:29:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
REPORT
Doc Date
5/14/2010
Doc Name
2009 Annual Hydrology Report
From
Kerr Coal Company
To
DRMS
Annual Report Year
2009
Permit Index Doc Type
Hydrology Report
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kerr (Marr) Mine - 2009 Annual Hydrology Report <br />STATION 320 <br />EC-field <br />Date Flow Rate (cfs) Temp © pH -field (s. u.) (umhos/cm) <br />3-24-09 1.0 12 8.0 400 <br />4-1-09 1.0 <br />4-8-09 0.25 <br />4-15-09 1.0 11 8.0 400 <br />4-20-09 1.5 10 8.0 400 <br />4-28-09 1.5 <br />5-6-09 2.0 <br />5-13-09 1.5 <br />5-21-09 1.5 16 8.0 300 <br />5-29-09 1.5 <br />6-4-09 2.0 <br />6-11-09 2.0 17 8.0 350 <br />6-17-09 2.0 13 8.0 400 <br />6-24-09 2.4 14 8.0 400 <br />7-1-09 1.5 18 8.0 500 <br />7-8-09 1.5 <br />7-15-09 1.5 21 8.0 450 <br />7-22-09 1.5 <br />7-28-09 1.0 <br />8-5-09 1.0 <br />8-12-09 NO FLOW <br />6.0 WELL INSPECTION <br />The wells associated with the Kerr Loadout Monitoring requirements were inspected for defects and/or <br />repair needs. No anomalous conditions were observed during the April 20, 2009 inspection. Alluvial <br />wells AP-1 and AP-2, located at the Loadout, will continue to be monitored until final bond release is <br />achieved for that site. <br />7.0 FUTURE MONITORING <br />During the 2009 water year, monitoring activities were conducted according to methodologies and <br />procedures presented in the approved Kerr Water Monitoring Plan with reductions to the program as <br />approved by the DRMS since issuance of the Monitoring Plan. Monitoring activities in the 2010 water <br />year will continue to be conducted in accordance with approved procedures for the Loadout area until a <br />final bond release is submitted and also approved or until authorization is provided by the DRMS and <br />associated agencies to terminate monitoring.
The URL can be used to link to this page
Your browser does not support the video tag.