Laserfiche WebLink
TR-121 Project Plan <br />Projected Commencement date 6/15//2010 <br />of road construction: <br />Commencement date of drilling: 7/1/2010 <br />Right-of-entry documentation: <br />Federal Coal lease COC- 67232 and email from Ryan Taylor of USFS dated April 22, 2010 <br />The following topics for the above-referenced revision are as described in Tab PR-14 of Exhibit 80 of DRMS Mining <br />and Reclamation Permit C-80-007. <br />Water Resources <br />Vegetation <br />Soils <br />Land Use <br />Proposed Low-Volume Roads (with the exception of the number of road miles that are noted in the attached table, <br />titled Project Details) <br />Drilling Activities <br />De-Gas Installation <br />Monitoring <br />Proposed Drill Hole Plugging Methods <br />Reclamation Plan <br />Anticipated Schedule (with the exception of the commencent dates of road construction and drilling noted above) <br />Reclamation Plan <br />U.S.F.S. Road Use Permit <br />Figures 1, 2, 3, and Typical Cross Section (of road) <br />SedCad Calculations for 0.25 Acre to 2.0 Acre MDW Pads <br />Gas Well Pad Slope Stability Analysis