My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-10_REVISION - M1980178
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980178
>
2010-05-10_REVISION - M1980178
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:55:56 PM
Creation date
5/17/2010 7:50:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980178
IBM Index Class Name
REVISION
Doc Date
5/10/2010
Doc Name
CN-01 approval
From
DRMS
To
Moores Mining, LLC
Type & Sequence
CN1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $15.43 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Dozer and ROPS : $15.43 NA NA $7.89 $14.63 $8.77 $13.86 NA NA NA NA <br />-Attachment no. 2: NA NA NA $0.00 $0.00 $0.00 $0.00 NA NA NA NA <br />Annual usage : $23.28 $11.92 $11.36 NA NA NA NA NA NA NA NA <br />Double shifts : $17.46 $5.96 $5.68 NA NA NA NA NA NA NA NA <br />Triple shifts : $15.53 $3.97 $3.78 NA NA NA NA NA NA NA NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $7.15 NA $7.95 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.00 NA $0.00 NA NA NA NA NA <br />Fuel/lube -Dozer and ROPS : NA NA NA NA NA NA NA $24.99 $5.41 $0.00 $2.01 <br />Attachment no. 2 : NA NA NA NA NA NA NA $0.00 $0.00 $0.00 $0.00 <br />ADJUSTED COST SUBTOTALS Ownership Costs Overhaul and Operating Costs <br /> Overhaul Field Repair <br /> Depreciation CFC Overhead Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Dozer, ROPS and Attachment no. 2: Dozer and ROPS <br />Single shifts : $23.28 $11.92 $11.36 $7.15 $14.63 $7.95 $13.86 $24.99 $5.41 $0.00 $2.01 <br />Double shifts : $17.46 $5.96 $5.68 - Attachment no. 2 : <br />Triple shifts : $15.53 $3.97 $3.78 ........ .... ......$0.00........... $0.00: :$0.00::.: $0.00. ;:::::;$0.00$0.00 $0.00 : <br /> <br />HOURLY OPERATOR WAGES <br />Base <br />Fringe <br />F.I.C.A. .. <br />UnempI. <br />Wk.Comp. <br />Total <br /> Rate Benefits 7.65% 6.20% 10.00% ($/hr) Shift Differential Colorado labor zone <br />Dozer operator (< 70hp $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Day : $0.00 Two shift per day average : $0.15 <br />Dozer operator (-70hp $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $23.82 $9.22 $1.82 $1.48 $2.38 $38.72 Night : $0.45 <br />;:.. <br />HOURLY EQUIPMENT COST SUMMARY <br />Ownership <br />Operating and Overhaul <br />Operator <br />Total <br /> Machine Attachments Cost/hr ($) <br />Single shifts : $46.56 $76.01 $0.00 $38.54 $161.10 <br />Double shifts : $29.10 $76.01 $0.00 $38.69 $143.79 <br />Triple shifts : $23.28 $76.01 $0.00 $38.79 $138.07 <br /> <br /> <br />EQUIPMENT PERFORMANCE DATA Horsepower Transmission Weight Length Width Height Fuel Ripper <br />I Description (FHP) Type (UST) (ft) (ft) (ft) type type <br />Dozer : Cat D8R Series 11 - 8SU (2 310 NA 41.8 22.7 8.7 11.5 diesel NA <br />Blade: Semi-Universal NA NA 5.4 NA 12.9 5.5 NA NA <br />Attachment no. 1 : ROPS Cab NA NA NA NA NA NA NA NA <br />Attachment no. 2: NA NA NA NA NA NA NA NA NA <br /> Total weight : 47.2 (UST)
The URL can be used to link to this page
Your browser does not support the video tag.