Laserfiche WebLink
t <br />::.. 2 ...... <br />Xxx: <br />:.::..................:....:::.:.....:::::.::::..::.:..............:::::::................................................... sheet <br />:::::: ::::::::::......................................................... . <br />t2r%Ar%ADI c Cl1111D11ACA1T of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $47.34 1 $47.34 $47.34 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $47.34 $47.34 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Grand Junction <br />Transportation Cycle Time : Non- Total one-way travel distance : 50.0 miles <br />Roadable Roadable Average travel speed : 50.0 mph <br />Equipment <br />Haul time (hours) = 1.00 <br />Return time (hours) = 1.00 <br />Loading time (hours) = 0.50 <br />Unloading time (hours) = 0.50 <br />Subtotals = 3.00 <br />JOB TIME AND COST <br />1.00 Total non-roadable mob/demob cost * : $2,523.56 <br />1.00 * two round trips with haul rig <br />NA Total roadable mob/demob cost ** : $94.69 <br />NA ** one round trip, no haul rig <br />2.00 <br /> <br /> <br />Total job time : ....................... <br />6.00 hours <br /> Total job cost : $2,618