Laserfiche WebLink
STATE OF COLORADO <br />(2) 1 Mining Plan Map <br />0 (a) outline and label the permit boundaries, described in Exhibit A - Legal <br />Description; for all 110 Limited Impact and 111 Special Operations, the Office <br />considers the area bounded by the permit boundary to be analogous to the <br />affected area; <br />E3 (b) label the names of owner(s) of record of the surface of the affected area and of <br />the land within two hundred (200) feet of the affected area, identify the owner <br /> of the substance to be mined, and the type of structure and owners of record of <br /> any permanent or man-made structures within 200 feet of the affected area; <br />(c) outline and label all major surface features to be used in connection with the <br />proposed operation such as: existing and proposed roads, pit boundary, topso <br />stockpiles, overburden stockpiles, product stockpiles, waste rock fills, stream <br />channels, buildings, processing plant, underground openings such as adits or <br />ventilation facilities, ponds, impoundments, dewatering pumps, diversions or <br /> waste disposal areas; <br />(d) indicate the direction that construction material extraction will proceed; <br />0 (e) note the location of any significant, valuable, and permanent man-made <br />structures within two hundred (200) feet of the affected area. A narrative <br /> description must be provided in Exhibit B - Site Description; and <br />(f) outline and label existing disturbance within and/or adjacent to the permit <br />boundary (e.g., previously mined areas, roads or excavations resulting from <br />utility construction). Re-disturbance of previously disturbed areas, by the <br />proposed mining operation, must be included in the permit area and addressed <br /> in Exhibit D - Reclamation Plan. <br />(3) Reclamation Plan Map <br />0 (a) show the gradient of all reclaimed slopes (horizontal:vertical) sufficient to <br />describe the post mine topography; <br />(b) indicate where vegetation will not be established and the general area(s) for <br />shrub or tree planting; <br />(c) <br />ANA if ponds are a part of the Reclamation Plan, outline the final shore configuration <br />of the ponds and shallow areas if the future land use is for wildlife; <br />0 (d) state the average thickness of replaced overburden by reclamation area or <br />phase; and <br />0 (e) state the average thickness of replaced topsoil by reclamation area or phase. <br />Note: (3) (d) and (e) noted in Exhibit D Reclamation Plan. (OK) <br />Page 7 of 10