Laserfiche WebLink
Attachment 2 <br />Summary of Release Acreages and Dollar Amounts to Date <br />SENECA II MINE BOND RELEASE ACREAGE <br />Interim and Permanent Prog ram Areas <br /> Total Disturbed Phase I <br />Released Phase II <br />Released Phase III <br />Released <br />SL-1 1968.8 1795.4 0 0 <br />SL-2 1968.8 NA NA NA <br />SL-3 1968.8 0 1213.1 0 <br />SL-4 1968.8 135.3 0 0 <br />Pre-Law Areas <br />SL-1 326.5 259.1 0 0 <br />SL-2 326.5 0 257.71 257.71 <br />SL-3 326.5 NA NA NA <br />SL-4 326.5 NA NA NA <br />SENECA II MINE BOND LIABILITY ACREAGE <br />Interim and Permanent Prog ram Areas <br /> Total Disturbed Phase I Not Yet <br />Released Phase II Not Yet <br />Released Phase III Not <br />Yet Released <br />SL-1 1968.8 173.4 1968.8 1968.8 <br />SL-2 1968.8 173.4 1968.8 1968.8 <br />SL-3 1968.8 173.4 755.7 1968.8 <br />SL-4 1968.8 38.1 755.7 1968.8 <br />Pre-Law Areas <br />SL-1 326.5 67.4 326.5 326.5 <br />SL-2 326.5 NA NA 68.79 <br />SL-3 326.5 NA NA 68.79 <br />SL-4 326.5 NA NA 68.79 <br />Page 18 of 30