Laserfiche WebLink
Reclamation Success at Bond Release Block Z-A-08 <br /> In the E-AB-08 bond release block, cracks associated with slumping were observed, indicating that <br /> this area appears to be unstable. Because of this the Division will not be able to release the E-AB-08 <br /> block from Phase II liability at this time. <br /> With regard to the crack and slump in the previously Phase III released area, the Division will work <br /> with Trapper Mining Inc. to characterize the degree and extent of instability in this area. This will likely <br /> require Trapper Mining Inc. to reincorporate a portion of this previously released area to the un- <br /> released portion of the site. <br /> Documents Received <br /> Graham Roberts of Trapper Mining Inc. provided the Division with revisions to the SL-11 application <br /> package. These revisions reflected changes in the Z-AB-08 block due to re-disturbance for <br /> construction of a fueling pad and ready line. Changes were made to two maps and two pages within <br /> the application. <br />