Laserfiche WebLink
Permit Amendment (AM-06) - Climax Mine <br />• A-2 Affected Area Description <br />• <br />The proposed affected area encompasses a total of 7,854 acres. The proposed affected area is shown <br />on Figure AM-06-13-01 (Exhibit B) and the 1980 and 1997 approved affected land boundaries are shown <br />in relation to the proposed affected area boundary on Figure AM-06-C-01 (Exhibit C). <br />The proposed affected area boundary was selected to encompass areas that have the potential to be <br />disturbed during future mining and reclamation activities and to encompass the area between the existing <br />interceptors. Because signage of the entire affected land boundary is impractical, permanent landmarks <br />and consistent offsets have been defined to make the affected area boundary easier to identify in the <br />field. Table A-2 outlines the landmarks and offsets used for each stretch of the proposed affected area <br />boundary. <br />Table A-2: Affected Area Boundary Landmarks for Field Identification <br /> Offset <br />Boundary Section Landmark or Site Feature Used feet <br />Fremont Pass to SW corner of Eagle <br />Park Reservoir Southernmost reclaimed pipeline 100 <br />Columbine Pipeline Corridor Anticipated pipeline corridor 200 <br /> To include water management facilities <br />West side of Eagle Park Reservoir at the base of 4 Dam <br />Northwest corner of Eagle Park <br />Reservoir to Searle Creek West Interceptor Road 250 <br />Searle Creek to Surge Riser above 5 <br />Dam West Interceptor Road 300 <br />Surge Riser to northernmost boundary <br />corner 1980 a roved affected area boundary <br />Tenmile Creek to Highway 91 near <br />Humbug Ditch Reclaimed as line right of way East side <br />Supply Canal No. 1 (Humbug Ditch) <br />Disturbance on Climax Property Disturbed Area (parking lot, road, ditch 100 <br />Humbug Ditch off Climax Property Center line 15 <br />Humbug Ditch Parking Lot to South side <br />of Clinton Reservoir Highway 91 West side <br />Clinton Reservoir Parkin area 1980 approved affected area boundary <br />Clinton Reservoir Parking area to <br />McNulty Interceptor Highway 91 East Side 100 <br />Around McNulty OSF and the Open Pit Anticipated mining disturbance and <br />to Storke Yard watershed breaks <br />Storke Yard to Highway 91 Count Road South side <br />Hwy 91 along Arkansas Pond Highway 91 North side <br /> Current or past disturbance (pipeline, <br />Arkansas Well to Fremont Pass topsoil stockpiles) 50 <br />A-3 Main Entrance Location <br />The main entrance to the Climax Mine is located at Northing 4358290.4, Easting 397673.4; North <br />American Datum (NAD) 1983, Universal Transverse Mercator (UTM) Zone 13N, measured in meters. <br />Figure AM-06-B-01 (Exhibit B) shows the location of the main entrance on a topographic map in <br />• accordance with HRMMR §6.4.1 (2). <br />Exhibit A A-6 May 2010