My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_GENERAL DOCUMENTS - C1982057
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1982057
>
2010-05-07_GENERAL DOCUMENTS - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:36 PM
Creation date
5/11/2010 1:40:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
General Documents
Doc Date
5/7/2010
Doc Name
Proposed Decision & Findings of Compliance for SL2
From
Phase I
Permit Index Doc Type
Findings
Email Name
DTM
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Surface Blasting Work cont'd Task #: 002 sheet 2 of 2 <br />BLASTING MATERIALS QUANTITIES QUANTITY UNIT <br />Total quantity of stemming required 36.71 cubic yards <br />Total quantity of explosives required 5,546 pounds <br />Total quantity of det. cord/fuse/wire required 5,613 lin. feet <br />Quantity of blasting caps used per blasthole 1 cap(s_)_ <br />Total quantity of blasting caps required 124 caps _ <br />Quantity of primers used per blasthole 1 rimer(s) _ <br />Total quantity of primers required 124 rimers <br />Quantity of delays used per blasthole 1 delay(s) _ <br />Total quantity of delays required 125 delays <br />HOURLY EQUIPMENT COST Shift basis : 1 per day Data source : (CRG data) <br />Drilling equipment- Drill :I REEDRILL SK35, 9.0 in. <br />- Drill pad preparation : NA <br />Misc. drilling support equipment : NA <br />Misc. explosives support equipment: NA <br />Explosives delivery/prep. - Bulk truck :NA <br />- Cap truck : NA <br />Cost Breakdown : Drilling <br />Equipment Drill Pad <br />Preparation Misc. Drill Misc. Expl. <br />Support Support Explosives <br />Bulk Truck Delivery <br />Cap Truck <br />Import data filename : drilling NA NA NA NA NA <br />Utilization -machine+att. no. 1 : 100 NA NA NA NA NA _ <br />-ripper or attachment no. 2 : 100 NA NA NA NA NA <br />Equipment ownership $/hr : $57.96 NA NA NA NA NA _ <br />Machine+att. 1 operating $/hr : $120.95 NA NA NA NA NA _ <br />Ripper or att. 2 operating $/hr : $4.80 NA NA NA NA NA _ <br />Operator+additional labor $/hr : $44.84 NA NA NA NA NA _ <br />Unit subtotals : $228.54 $0.00 $0.00 $0.00 $0.00 $0.00 <br />Number of units : 1 0 0 0 0 0 <br />Group subtotals : $228.54 $0.00 $0.00 $0.00 $0.00 $0.00 <br />Total work team cost/hour : WZZ5.04 <br />MATERIALS COST <br /> Description Unit Unit Cost Quantity Total Cost <br />Blasting agent: Bulk ANFO nom. density pound $0.221 5,545.56 $1,225.57 <br />Primers or boosters : Cast primer, 0.3 lb each $2.728 124.00 $338.27 <br />Blasting caps: Non-electric cap, inst. each $3.647 124.00 $45_2.23 <br />Det. cord, fuse or wire : Detonating cord, 10 g0ft. linear foot $0.112 5,613.30 $628.6_9 _ <br />Delays : MS connectors each $4.648 125.00 $581.00 <br />Miscellaneous : Stemming, 1.5 in. gravel cu. yd. $29.06 31.97 _$929.10_ <br />Drill bits * : bit life = 1,750.0 linear feet $2,279.00 1.42 $3,229.67 <br />bit life unit = linear foot, bit cost unit = each (per bit) Total materials cost : 6z,3two3 <br /> <br />DRILLING AND EXPLOSIVES PREPARATION TIME <br /> Job Condition Correction Factors - Site altitude : 8,000 feet <br /> Altitude adjustment : 0.90 (DMG est.) <br />Total drilling length : 2,480 linear feet Job efficiency factor : 0.67 (Ch. Exc. HB) <br />Unadjusted drilling rate : 82.00 feet/hour Adjusted drilling rate : 49.45 feet/hour <br />Drilling time : 50.16 hours Explosives prep. time : 22.77 hours <br /> <br />JOB TIME AND COST Total job time : 72.93 hours <br />Total unit cost : $1.954 per cu. yd. Total job cost : $18,847 <br />
The URL can be used to link to this page
Your browser does not support the video tag.