Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk <br />NPDES ID. No.: <br />Inspection Period: <br />Inspection Date: <br />Pond #7 <br />First Quarter 2010 <br />03/10/10 <br />General Description or Reference to Site Plan: <br />This sediment control pond lies east of the preparation plant and pond #6. It receives run-off from <br />the majority of the active surface facilities area lying south of State Highway 12. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion:" <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />Excellent " oFew Poor <br />Extensive Some Few None <br />Yes No <br />Yes No L-" <br />4). Erosion of the downstream toe of the embankment? Yes No ??- <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes No <br />Could this seepage cause potential instability? <br />PRINCIPAL SPILLWAY. <br />1). Is the principal spillway system in working order? <br />2).. Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Yes No <br />Yes - y No <br />Yes No <br />Yes No <br />Just starting None