Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAMWORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 028 State : Colorado Permit/job #: C-1982-057 <br />_ <br />Date : 0412812010 County: Routt Abbreviation :none <br />User : JRS Site : Seneca li-W Filename : C057-028 <br />Permit or other job action :Partial Phase 1 Bond Release S1-02 <br />Task description :Remove Haul Road Surface Material to Pit <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />(Equipment Description <br />Cost Bre <br />Scraper work team -Scraper : Cat 637G w/push-pull <br />-Push dozer: NA <br />Support equipment -Load area : NA <br />-Dump area :NA <br />Road maintenance -Motor grader: CAT 14H <br />-Water truck :Water Tanker, 10,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Eq <br />Load area uipment <br />Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : NA NA NA grader misctruk <br />% Utilization-machine : NA NA NA 25 ____25 <br />-Ripper attachment : P <br />NA NA NA NA 0 NA <br />Ownerhip cost/hour : $J NA NA NA $41079 _ $62.58 <br />Operating cost/hour : $163.34 NA NA NA $11.56 $21.28 <br />Ripper op. cost/hour : NA NA NA NA $0.00 NA _ <br />Operator cost/hour : $24.98 NA NA NA $24.50 $38.70 <br />Unit subtotals : $298.21 NA NA NA $77.85 $122.56 <br />Number of units : 4 0 0 0 1 1 <br />' <br />Group subtotals : Work : $1,192.85 Support: $0.00 aintenance : $200.41 <br />Maintenance- <br />Total work team cost/hour : $1,393.26 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 84,675 LCY factor : NA volume : 84,675 LCY <br />Source of quantity take-off :Page 25-1-22 <br />Source of estimated swell factor : NA