Laserfiche WebLink
were mined in the Section 16 Pit, which is also in reclamation. Coal from the Colowyo <br />Mine is trucked to the Gossard Loadout and shipped to market by rail. <br />Permit History <br />Pre-startup activities for a surface mine permit commenced in the summer of 1973 and <br />Open Pit Mining Permit No. 76-15 was issued on 31 August 1976. This permit was <br />converted to Development and Extraction Mining Permit No. 76-15C/A on 25 January <br />1977. An application for Permit C-1981-019 was submitted on 13 September 1982 and <br />the permanent program permit was issued on 4 November 1982. The permit was <br />renewed on 10 July 1987 (RN-01), 30 June 1992 (RN-02), 30 October 1997 (RN-03), 23 <br />October 2002 (RN-04) and 15 September 2009 (RN-05). <br />Mining History <br />Underground mining activities in the vicinity of the current permit were started in 1914. <br />Colowyo conducted underground mining operations at the Red Wing Mine from 1945- <br />1974. Surface mining operations began in 1976 and have continued uninterrupted to <br />date. Initially permitted as a single seam operation, Colowyo began its operations in the <br />East Pit, mining from north to south. The East Pit was developed as a multi-seam <br />operation (eight seams) in 1977. An eastern appendage of the East Pit, the Section 11 Pit, <br />was approved in 1991 and was later absorbed into the East Pit. Coal extraction by open <br />pit mining concluded in the East Pit in 2003 with highwall mining continuing until 2006. <br />Operations in the two-seam Section 16 Pit were initiated in 1998. The Section 16 Pit <br />mining was initially conducted from east to west but was later changed to mine from <br />north to south, as coal resources were depleted. Mining in the Section 16 Pit concluded <br />in 2002. The West Pit was developed as a multi-seam operation (eight seams) in 1998. <br />The mining progresses from north to south and coal extraction continues to date. The <br />South Taylor Pit was developed as a multi-seam operation (7 seams) in 2007. The <br />mining in the South Taylor Pit will progress first from east to west (after the opening of <br />the initial box-cut) then from west to east, as reserves are depleted. Coal extraction in the <br />South Taylor Pit continues to date. <br />Auger mining was conducted at the interface between the Section 11 Pit and East Pit <br />from 1993-1994. Highwall mining operations were conducted in the East Pit from 2004- <br />2006. Highwall mining operations were conducted in the West Pit in 2004, 2006, 2007 <br />and 2008 and are planned for other suitable areas as mining progresses. Highwall mining <br />operations were conducted in the South Taylor Pit in 2009 and are also planned for other <br />suitable areas as mining progresses. The use of highwall mining at the Colowyo Mine <br />has extended the economic recovery of coal resources beyond the economic limits of <br />deep-pit operations. <br />Colowyo Mine 2010 Midterm Review <br />Permit No. C-1981-019 10 May 2010