Laserfiche WebLink
Section 16: NE%, NE'/SE%, S%2SE'/, portions of the <br />NW % SE'/ and portions of the NW'./4 <br />Section 21: E%2 <br />Section 22: N%2 and the W%2SW% <br />The proposed permit area encompasses approximately 10,164 acres, of which 1,902 acres are <br />currently disturbed by Seneca Coal Company under CDRMS permit C-80-005, and 391.0 acres are <br />planned to be disturbed by surface operations of PSCM. Ownership of the surface is 4,876 acres of <br />private ownership, 80 acres of Federal land, and 5,208 acres of State lands. <br />The PSCM permit area is located about 9 miles southeast of the town oi'Hayden. The permit area <br />adjoins the Yoast Mine (C-94-082) permit area on the southwest and will incorporate a portion of the <br />Seneca II Mine (C-80-005) permit area on the east. The PSCM is found on the USGS Mount Harris <br />and Milner quadrangle maps. <br />Mining surface facilities are proposed in Sections 2 and 3, Township 5 North, Range 87 West, and <br />Sections 27, 34, and 35, Township 6 North, Range 87 West. During the first five-year permit term, <br />underground mine workings are proposed in Sections 2, 3, 10, 15, and 16, Township 5 North, <br />Range 87 West. <br />Peabody Sage Creek Mine 2 May 7, 2010