Laserfiche WebLink
jo? Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />April 2010 Monthly Report <br />Page 3 <br />Table 2 -April 2010 Tailing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br />Piezometer Date Depth to Water <br />feet Total Depth (ft) Volume of <br />Water ft <br />P12 4/29/10 41.69 41.71 0.02 <br />P13 4/29/10 40.93 41.34 0.41 <br />P14 4/29/10 D 41.24 0.00 <br />P15 4/29/10 D 41.10 0.00 <br />Table 3 below provides the calendar year 2010 sludge management for the San Luis site. <br />Table 3 - Water Treatment Plant Sludge Management Year to Date. <br />Date Quantity Sludge Management <br />February 2010 117 tons Transferred sludge from drying pad to <br />tailings impoundment. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379-0798 or Mr. Bill Lyle (303 324-2630. <br />S cerelyAy, <br />V1vV <br />Ju io F. Madrid <br />Environmental Coordinator III <br />Cc: Bill Lyle <br />File