My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2010-05-07_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:43 PM
Creation date
5/10/2010 10:05:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
5/7/2010
Doc Name
2010 Midterm Review & Revised Reclamation Cost Estimate
From
DRMS
To
New Elk Coal Company
Type & Sequence
MT3
Email Name
KAG
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />)JUSTED COSTS Ownership Costs <br />Depreciation CFC Overhead <br />Acquisition cost : $21.02 NA NA <br />Econ.life -Dozer and ROPS : $21.02 NA NA <br />-Attachment no. 2: NA NA NA <br />Annual usage : $31.72 $16.94 $19.11 <br />Double shifts : $23.79 $8.47 $9.55 <br />Triple shifts : $21.16 $5.64 $6.36 <br />Mechanic labor-Dozer and ROPS : NA NA NA <br />-Attachment no. 2 : NA NA NA <br />Fuel/lube -Dozer and ROPS : NA NA NA <br />Attachment no. 2 : NA NA NA <br /> <br />)JUSTED COST SUBTOTALS Ownership Costs <br />Depreciation CFC Overhead <br />izer, ROPS and Attachment no. 2: <br />Single shifts : $31.72 $16.94 $19.11 <br />Double shifts : $23.79 $8.47 $9.55 <br />Triple shifts : $21.16 $5.64 $6.36 <br /> <br />)URLY OPERATOR WAGES Base Fringe F.I.C.A. <br /> Rate Benefits 7.65% <br />Dozer operator (< 70hp $23.67 $9.22 $1.81 <br />Dozer operator (-70hp $23.67 $9.22 $1.81 <br />Mechanic $16.74 $4.20 $1.28 <br /> <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operatin <br />Machine g and Overhaul <br />Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $67.77 $95.29 $6.78 $38.54 $208.38 <br />Double shifts : $41.82 $95.29 $6.78 $38.69 $182.57 <br />Triple shifts : $33.16 $95.29 $6.78 $38.79 $174.02 <br />EQUIPMENT PERFORMANCE DATA <br />Description Horsepower <br />(FHP) Transmission <br />Type Weight <br />(UST) Length <br />(ft) Width <br />(ft) Height <br />(ft) Fuel <br />type Ripper <br />type <br />Dozer : Cat D9R - 9SU (2005) 405 NA 53.4 22.4 9.6 13.1 diesel NA <br />Blade : Semi-Universal NA NA 7.2 NA 14.2 6.3 NA NA <br />Attachment no. 1 : NA NA NA NA NA NA NA NA <br />Attachment no. 2 : 3-shank ripper NA NA 6.1 3.9 7.7 2.6 NA Adj. Parallelogram <br /> <br />Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />NA NA NA NA NA NA NA NA <br />$8.99 $21.14 $10.52 $20.59 NA NA NA NA <br />$1.32 $0.80 $2.41 $1.82 NA NA NA NA <br />NA NA NA NA NA NA NA NA <br />NA NA NA NA NA NA NA NA <br />NA NA NA NA NA NA NA NA <br />$5.25 NA $6.14 NA NA NA NA NA <br />$0.77 NA $1.41 NA NA NA NA NA <br />NA NA NA NA $31.57 $7.62 $0.00 $2.98 <br />NA NA NA NA $0.00 $0.47 $0.00 $1.51 <br /> <br />Overhaul and Operating Costs <br />Overhaul Field Repair <br />Labor I Parts Labor Parts Fuel I Lube Tires G.E.C. <br />zer and ROPS : <br />$5.25 $21.14 $6.14 $20.59 $31.57 $7.62 $0.00 $2.98 <br />achment no. 2: <br />$0.77 $0.80 $1.41 $1.82 $0.00 $0.47 $0.00 $1.51 <br /> <br />Unempl. Wk.Comp. Total <br />6.20% 10.00% ($/hr) Shift Differential Colorado labor zone : 2 <br />$1.47 $2.37 $38.54 Day : $0.00 Two shift per day average : $0.15 <br />$1.47 $2.37 $38.54 Swing : $0.30 Three shift per day average : $0.25 <br />$1.04 $1.67 $24.93 Night : $0.45 <br /> i <br /> <br />Total weight :1 66.7 (UST)
The URL can be used to link to this page
Your browser does not support the video tag.