Laserfiche WebLink
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $34.91 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Machine and Attach. no. 1 : $34.91 NA NA $5.48 $11.38 $6.68 $12.55 NA NA NA NA <br />-Attachment no. 2: NA NA NA $0.00 $0.00 $0.00 $0.00 NA NA NA NA <br />Annual usage : $51.02 $26.62 $28.40 NA NA NA NA NA NA NA NA <br />Double shifts : $38.27 $13.31 $14.20 NA NA NA NA NA NA NA NA <br />Triple shifts : $34.03 $8.86 $9.45 NA NA NA NA NA NA NA NA <br />Mech. Ibr.-Machine and Attach. No. 1: NA NA NA $3.20 NA $3.90 NA NA NA NA NA <br />-Attachment no. 2: NA NA NA $0.00 NA $0.00 NA NA NA NA NA <br />Fuel/lube -Machine and Attach. No. 1: NA NA NA NA NA NA NA $43.51 $10.84 $18.00 $1.56 <br />Attachment no. 2: NA NA NA NA NA NA NA $0.00 $0.00 $0.00 $0.00 <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel <br /> <br />Lube Tires <br /> <br />G.E.C. <br />Basic Machine and attachments No. 1 and No. 2 : Basic Machine and Attachment No. 1 <br />Single shifts : $51.02 $26.62 $28.40 $3.20 $11.38 $3.90 $12.55 $43.51 $10.84 $18.00 $1.56 <br />Double shifts : $38.27 $13.31 $14.20 ttachmenI No. 2 : <br />Triple shifts : $34.03 $8.86 $9.45 $0.00 $0.00 $0.00 $0.00 $0700 $0.00 $0.00 $0.00 <br /> i <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempi. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 10.00% ($/hr) Shift Differential Colorado labor zone : 2 <br />Loader operator (<=6cy $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Day : $0.00 Two shift per day average : $0.15 <br />Loader operator (> 6cy $23.82 $9.22 $1.82 $1.48 $2.38 $38.72 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $16.74 $4.20 $1.28 $1.04 $1.67 $24.93 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $106.04 $104.94 NA $38.72 $249.70 <br />Double shifts : $65.78 $104.94 NA $38.87 $209.59 <br />Triple shifts : $52.35 $104.94 NA $38.97 $196.26 <br />EQUIPMENT PERFORMANCE DATA <br />Description Type Struck <br />Capacity (cy) Heaped <br />Capacity (cy) Weight <br />(UST) Weight <br />(MT) Length <br />(ft.) Width <br />(ft.) Height <br />(ft.) Min. turning <br />circle (ft.) Horsepower <br />(fhp) Fuel <br />type <br />CA T 990 Series 11(2005) NA 9.50 11.25 83.93 NA 41.92 14.58 16.75 67.83 625.00 Diesel <br />ROPS Cab NA NA NA NA NA NA NA NA NA NA NA <br />NA NA NA NA NA NA NA NA NA NA NA NA <br />Travel speeds (mph) : 1 st (or max.) 2nd 3rd 4th 5th 6th 7th 8th Min. dump Max-dump <br />Forward : 4.3 7.5 12.9 0.0 NA NA NA NA clear.(ft) ht.(ft) <br />Reverse : 4.8 8.3 14.2 0.0 NA NA NA NA NA 13.17 <br />Loader bucket type Compaction Maximum vertical Max. horizontal Excavator bucket capacity (cy) Lift capacity (lbs) Maximum dig/rip Shank Number <br />or compactor drum type width per pass (ft.) reach height (ft) reach (ft) small medium large optimum max.reach depth (ft) spacing of shanks <br />Standard HD Quarry NA NA NA NA NA NA NA NA NA NA NA