Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 092 State : Colorado Permit/job #: C-1996-084 <br />Date : 0510412010 County : Las Animas Abbreviation : none <br />User: JHB Site :Lorencito Canvon Mine Filename :C084-092 <br />Permit or other job action :Midterm 3 <br />Task description :Mobilize/demobilize Equipment for site maintenance <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 907) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $18.82 $20.82 $23.42 <br />Operating cost/hour : $43.13 $45.10 $42.78 <br />Operator cost/hour : $23.90 $23.90 $23.90 <br />Helper cost/hour : $0.00 $19.49 $19.49 <br />Total Unit Cost/hour : $85.85 $109.31 $109.59 <br />_ _ _ _ _ <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weightlunit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D3G LGP - 3P 9.69 $11.79 $85.85 10 $976.42 $858.49 $0.00 <br />-Cat 315C L 18.63 $23.87 $85.85 10 $1,097.18 $858.49 $0.00 <br />-CAT 14H 2a 70 $41.79 $85.85 10 $1,276.36 $858.49 $2,500.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $3,349.95 $2,575.47 $2,500.00