My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2010-05-07_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:43 PM
Creation date
5/10/2010 10:05:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
5/7/2010
Doc Name
2010 Midterm Review & Revised Reclamation Cost Estimate
From
DRMS
To
New Elk Coal Company
Type & Sequence
MT3
Email Name
KAG
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatina Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 055 State : Colorado <br />Date : 0510312010 County : Las Animas <br />User: JHB Site: Lorencito Canyon Mine <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Midterm 3 <br />Task description :Replace Topsoil from Upslope Area to BA#1 <br />HOURLY EQUIPMENT COST _ <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $67.77 NA <br />Operating cost/hour : $95.29 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $201.60 Total fleet cost/hour : $403.20 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,080 BCY factor : 1.250 volume : 1,350 LCY <br />Source of estimated volume : Table 2.05.4-1f <br />Source of estimated swell factor : CAT Handbook <br />HOURLY= -- _ - - ?-=- <br />PRODUCTION ? __? - - <br />Job Condition Correction Factors <br /> Operator skill <br />Average push distance : 100 feet Material consistency <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method <br /> Visibility: <br />Material consistency description : Job efficiency : <br />Compacted fill or embankment Spoil pile : <br /> Push gradient : <br />Average push gradient : 5.00 % (neg) Altitude : <br />Average site altitude : 7,100 feet Material weight : <br /> Blade type <br />Material weight : 2550 Ibs/LCY Net correction <br />Weight description <br />Earth - Dry packed <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(s) <br />Unit cost : $0.480 /LCY <br />Source <br />0.75 (avg.) <br />0.90 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (1 shift/day) <br />0.60 (fnd-so <br />1.11 (Cat HB) <br />1.00 (Cat HB) <br />0.90 (Cat HB) <br />1.00 (S/SU/U) <br />0.34 <br />Adjusted unit production : 420.28 LCY/hr <br />Adjusted fleet production : 840.56 LCY/hr <br />Total job time : 1.61 Hours <br />Total job cost : $648 <br />Permit/job# : C-96-084 <br />Abbreviation :none <br />Filename : C084-055
The URL can be used to link to this page
Your browser does not support the video tag.