Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 053 State : Colorado Permit/job# : C-96-084 <br />Date : 0510312010 County: Las Animas Abbreviation :none <br />User: JHB Site : Lorencito Canyon Mine Filename : C084-053 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Midterm 3 <br />Task description : Replace Live-Handled Topsoil to E-3 <br /> <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $67.77 NA <br />Operating cost/hour : $95.29 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $201.60 Total fleet cost/hour : $403.20 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 900 CCY factor : 1.125 volume : 1,012 LCY <br />Source of estimated volume : Table 2.05.4-1f <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 150 feet <br />Unadjusted hourly production : 910.5 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth - Drv packed <br />0.00 % (pos) <br />7,100 feet <br />Z550 Ibs/LCY <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (1 shift/day) <br />Spoil pile : 0.60 (fnd-so <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.30 <br />Adjusted unit production : 275.96 LCY/hr <br />Adjusted fleet production : 551.92 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(s) Total job time : 1.83 Hours <br />Unit cost : $0.731 /LCY Total job cost : $740