Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 047 State : Colorado Permit/job# : C-96-084 <br />Date : 0510312010 County :Las Animas Abbreviation :none <br />User : JHB Site : Lorencito Canyon Mine Filename : C084-047 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Midterm 3 <br />Task description :Replace Live-Handled Topsoil to S-3 <br /> <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $67.77 NA <br /> Operating cost/hour : $95.29 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $201.60 Total fleet cost/hour : $403.20 <br /> <br />MATERIAL QUANTITIES _. ........... ... _......: <br />Initial Swell Loose <br />volume : 890 CCY factor : 1.125 volume : 1,001 LCY <br /> <br />Source of estimated volume : Table 2.05.4-1f <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 75 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,514.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile : 660 (fnd-so <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,100 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2550 Ibs/LCY Net correction : 630 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 458.96 LCY/hr <br /> Adjusted fleet production : 917.92 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(s) Total job time : 1.09 Hours <br />Unit cost : $0.439 /LCY Total job cost : $440 <br />