Laserfiche WebLink
Truck/Loader Team Work cont'd Task #: 030 <br />Loadina Tool Cycle Time:. Number of loading tool passes required to fill truck <br />Excavators and front shovels -machine cycle time vs. job condition rating : NA <br />- selected value within basic rating : NA <br />Track loaders - material descr.: NA <br />- cycle time elements (min.) : Load <br />NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders - unadjusted basic loader cycle time ( load, maneuver, and dum f 0.625 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : Mixed material 0.020 (Cat HB) <br />Stockpile : Conveyor or dozer piled 10 ft. high or less 0.010 (Cat HB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br /> Net cycle time adjustment : -0.050 <br /> Adjusted loader cycle time (total time per loader pass) : 0.575 <br /> Net load time per truck * : 1.825 <br />Truck Cycle Time : • bulk of 1st loader cycle completed during truck exchange if adj. loader cycle time < exchange time <br />Truck exchange time **: 0.70 minutes........ Adjusted for site altitude : 0.700 <br />Truck load time: 1.825 minutes........ Adjusted for site altitude : 1.825 <br />Truck maneuver and dump time: 1.10 minutes........ Adjusted for site altitude : 1.100 <br />•• set at 0 if exchange time < adj. loader cycle time (truck exchange completed during 1st loader cycle) <br />Truck travel (haul & return) time: Road condition : Rutted dirt, little maintenance, no water, 2" tire pi <br />Haul route : <br />Road <br />segment # Haul distance Grade <br />res. (%) Rolling <br />res. (%u) Total <br />resistance (%) Speed Travel time <br />(minutes) <br />1 1,000 -8.00 5.00 -3.00 3512 0.343 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />minutes <br />minutes <br />minutes <br />minutes <br />minutes <br />minutes <br />Haul time ** : 0.343 minutes <br />minutes <br />minutes <br />Loading tool unit production : 935.64 LCY/hour...... Adjusted for job efficiency : 776.58 LCY/hour <br />Truck unit production : 497.27 LCY/hour...... Adjusted for job efficiency : 412.73 LCY/hour <br />Optimal no. trucks/loading tool : 2 trucks........... Selected no. trucks/loader : 2 trucks <br /> Adjusted hourly truck team production : 825.47 LCY/hr <br /> Adjusted hourly single truck/loader team production : 776.58 LCY/hr <br /> Adjusted hourly multiple truck/loader team production : 776.58 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 8.10 Hours <br />Unit cost : $1.396 /LCY Total job cost : $8,782 <br /> <br />sheet 2 of 2 <br />4 passes <br />travel time shown for each segment includes acceleration/deceleration adjustment Return time**: 0.783 <br />•• total haul and return time shown includes altitude adjustment Total truck cycle time : 4.751