Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 026 State : Colorado Permit/job # : (r"-96-084 <br />Date : 0413012010 County : Las Animas Abbreviation :none <br />User : JHB Site : Lorencito Canyon Mine Filename : (:084-026 <br />Permit or other job action :Midterm 3 <br />Task description: Replace Topsoil from Stockpile SSP#2 to Fill 9a <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />?Enuinment Descrintion <br />Truck/loader team -Truck :Cat 773D (2002) <br />-Loader : CAT 990 Series 11(2005) <br />Support equipment -Load area : Cat D9R - 9SU (2005) <br />-Dump area :Cat D9R - 9SU (2005) <br />Road maintenance -Motor grader : CAT 14H <br />-Water truck : Water Tanker, 5,000 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer grader misctruk <br />% Utilization-machine : 100 97 50 100 25 25 <br />-Ripper attachment : NA NA 50 0 0 NA <br />Ownership cost/hour : $63.47 $106.04 $67.77 $58.16 $41.68 $24.58 <br />Operating cost/hour : $87.44 $101.45 $47.65 $95.29 $11.56 $8.33 <br />Ripper op. cost/hour : NA NA $3.39 $0.00 $0.00 NA <br />Operator cost/hour : $22.29 $38.72 $38.54 $38.54 $24.50 $38.70 <br />Unit subtotals : $173.20 $246.21 $157.34 $191.99 $77.75 $71.60 <br />Number of units : 2 1 1 1 1 1 <br />Group subtotals : Work : $592.61 Support : $349.33 Maintenance : $149.35 <br />Total work team cost/hour : <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 4.950 CCY factor : 1.125 volume : <br />$1,091.28 <br />5.569 LCY <br />Source of quantity take-off : Table 2.05.4-1f <br />Source of estimated swell factor : CAT Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />4 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 2,550 pounds/LCY Struck volume <br />Descr.:Earth - dry packed Heaped volume : <br />Rated payload : 108,060 pounds Average volume : <br />Payload capacity : 42.38 LCY Adjusted volume': <br /> Final truck volume based on number of loader passes <br /> 'truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : <br />Rated capacity (nom. heaped) : 11.250 LCY Truck <br />Descr.:Loose material - 1 " and over (85 - 90%) Altitude adj.: 1.000 <br />Bucket fill factor : 0.875 Job efficiency : 0.830 <br />Adjusted bucket capacity: 9.843 LCY Net correction : 0.830 <br /> <br />33.80 LCY <br />45.90 LCY <br />39.85 LCY <br />42.38 LCY <br />39.38 LCY <br />Site altitude (ft.) : 7,100 <br />Loader Source <br />1.000 (Cat HB) <br />0.830 (1 shift/day) <br />0.830 <br />