Laserfiche WebLink
Task 069 Rill and Gully/road repair over 10 year liability <br />based on SII SL4 task 087 <br />JHB 4/15/2010 Peabody Sage Creek Mine C2009-087 <br />assume 40 hrs/year, plus 4 hrs. mob/demob from Hayden, 10-year liability period <br />Caterpillar 14H hours cost/hr cost <br />mob/demob 40 $ 166.32 $ 6,652.80 <br />grading 400 $ 166.32 $ 66,528.00 <br />y7 / J,JLOV.OV <br />2010 RS Means 02 91 10