My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_APPLICATION CORRESPONDENCE - C2009087
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2009087
>
2010-05-07_APPLICATION CORRESPONDENCE - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:35 PM
Creation date
5/10/2010 10:04:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
APPLICATION CORRESPONDENCE
Doc Date
5/7/2010
Doc Name
Revised Reclamation Cost Estimate (Memo)
From
Janet Binns
To
Tom Kaldenbach
Email Name
TAK
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost EstimatinD Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />Task #: 065 State : Colorado Permit/job # : C2009-087 <br />Date : 0311712010 County :Routt Abbreviation :none <br />User: JHB Site : Peabody Sage Creek Mine Filename : C87 -065 <br />Permit or other job action :New application <br />Task description: remove gravel from North facilities parking area (12) <br />~HOURLY EQUIPMENT COST Shift basis : 1 per day <br />IFnitipment Description <br />Truck/loader team -Truck <br />-Loader <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />`771D <br />T 988G (2005) <br />T 14H <br />ter Tanker, 10,000 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA grader misctruk <br />% Utilization-machine : 100 96 NA NA 25 25 <br />-Ripper attachment : NA NA NA NA 0 NA <br />Ownership cost/hour : $43.31 $62.60 NA NA $41.79 $62.58 <br />Operating cost/hour : $64.93 $73.57 NA NA $11.56 $21.28 <br />Ripper op. cost/hour : NA NA NA NA $0.00 $0.00 <br />Operator cost/hour : $22.29 $38.72 NA NA $24.50 $38.70 <br />Unit subtotals : $130.53 $174.89 NA NA $77.85 $122.56 <br />Number of units : 6 1 0 0 1 1 <br />Group subtotals : Work : $958.06 Support: $0.00 Maintenance : $200.41 <br />Total work team cost/hour : $1,158.47 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 4,195 CCY factor : 1.090 volume: 4,572 LCY <br />Source of quantity take-off :Map 2.05.3 M1B, 2.6 ac. X 1 ft. th. <br />Source of estimated swell factor : Caterpillar Handbook 40th edition <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 2,400 pounds/LCY Struck volume : 26.40 LCY <br />Descr.: Clay and gravel - Dry Heaped volume : 36.00 LCY <br />Rated payload : 92,900 pounds Average volume : 31.20 LCY <br />Payload capacity : 38.71 LCY Adjusted volume': 36.00 LCY <br />Final truck volume based on number of loader passes : 27.06 LCY <br />'truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) : 6,625 <br />Rated capacity (nom. heaped) : 8.200 LCY Truck Loader Source <br />Descr.: Other - rock/dirt mixtures (100-120%) Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 1.100 Job efficiency : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity : 9.020 LCY Net correction : 0.830 0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.