My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_APPLICATION CORRESPONDENCE - C2009087
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2009087
>
2010-05-07_APPLICATION CORRESPONDENCE - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:35 PM
Creation date
5/10/2010 10:04:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
APPLICATION CORRESPONDENCE
Doc Date
5/7/2010
Doc Name
Revised Reclamation Cost Estimate (Memo)
From
Janet Binns
To
Tom Kaldenbach
Email Name
TAK
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 4 <br />New Application, Cost Summary <br />Colorado Division of Reclamation, Mining and Safety <br />Reclamation Cost Summary <br />Permit No. C-2009-087 Prepared by: JHB Date: 5/7/2010 <br />Mine name: Peabody Sage Creek County: Routt <br /> Permit or job action: <br />TASK LIST (D IRECT COSTSI Permit Application <br /> <br />Total Direct Costs $4,417,694 <br /> <br />INDIRECT COSTS <br /> <br />Contractor's overhead & profit <br /> Liability insurance: 2.02% %u of direct costs total = $ 89,237 <br /> Performance bond: 1.05% % of direct costs total = $ 46,386 <br /> Job superintendent: 1723.79 hrs. at $ 52.10 per hour total = $ 89,810 <br /> Profit: 10.00% % of direct costs total = $ 441,769 <br /> TOTAL O & P= $ 667,202 <br /> CONTRACT AMOUNT (direct + O & P)= $5,084,896 <br />DMG project management <br /> Financial warranty processing (legal/related costs): NA <br /> Engineering work and/or bid preparation: 4.25% % of contract $ 216,108 <br /> Reclamation management and/or administration: 3.25% % of contract $ 165,259 <br /> <br />Contingency NA %u of direct costs <br /> <br /> Total indirect reclamation costs $1,048,569 <br /> Total performance bond amount (direct costs plus indirect costs) $5,466,263 <br />
The URL can be used to link to this page
Your browser does not support the video tag.