Laserfiche WebLink
sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />Agency or organization name :Division Of Reclamation, Mining And Safety <br />Task # : 060 State : Colorado Permit/job #: C2009-087 <br />Date : 0311612010 County : Routt Abbreviation :none <br />User : JHB Site: Peabody Sage Creek Mine Filename :C087-060 <br />Permit or other job action : New Application <br />Task description :replace topsoil on 4.79 ac. Utility Pad <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Equipment Description <br />Cost Bre <br />Scraper work team -Scraper :ICat 637G w/push-pull <br />-Push dozer :INA <br />Support equipment -Load area :INA <br />-Dump area :INA <br />Road maintenance -Motor grader :I CAT 14H <br />-Water truck l Water Tanker, 10,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA grader misctruk <br />% Utilization-machine : 100 NA NA NA 25 25 <br />-Ripper attachment : NA NA NA NA 0 NA <br />Ownerhip cost/hour : $109.89 NA NA NA $41.79 $62.58 <br />Operating cost/hour : $163.34 NA NA NA $11.56 $21.28 <br />Ripper op. cost/hour : NA NA NA NA $0.00 $0.00 <br />Operator cost/hour : $24.98 NA NA NA $24.50 $38.70 <br />Unit subtotals : $298.21 NA NA NA $77.85 $122.56 <br />Number of units : 2 0 0 0 1 1 <br />Group subtotals : Work : $596.43 Support : $0.00 Maintenance : $200.41 <br />Total work team cost/hour <br />MATERIAL QUANTITIES <br />$796.83 <br />Initial Swell Loose <br />volume : 7,728 CCY factor : 1.102 volume : 8,516 LCY <br />Source of quantity take-off :Map 2.05.3 MIA, 4.79 ac. X 12" th. <br />Source of estimated swell factor : Caterpillar Handbook 40th edition