Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 029 State :Colorado Permit/job# :C2009-087 <br />Date : 0310512010 County : Routt Abbreviation :none <br />User: JHB Site :Peabody Sage Creek Mine Filename : C087-029 <br />Agency or organization name :Division Of Reclamation, Mining And Safety <br />Permit or other job action : New application <br />Task description :Regrade Haulroad B-1 reduction <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 3.556 <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 :BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source: (CRG) <br /> - <br />Utilization % <br />Ownership cost/hour : $67.77 NA <br />Operating cost/hour : $95.29 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $201.60 Total fleet cost/hour : $201.60 <br /> <br />CCY <br />Swell Loose <br />factor : 1.165 volume <br />4,142 LCY <br />Source of estimated volume: Map 2.05.3 MIA <br />Source of estimated swell factor : Caterpillar Handbook 40th edition <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 546.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Partly consolidated stockpile Spoil pile : 0.70 (fnd-mf) <br /> Push gradient : 0.97 (Cat HB) <br />Average push gradient : 1.90 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,675 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.37 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 201.59 LCY/hr <br /> Adjusted fleet production : 201.59 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 20.55 Hours <br />Unit cost : $1.000 /LCY Total job cost : $4,143 <br />