Laserfiche WebLink
Page 3 of 3 <br />Project Identification <br />Agency or organization name: Colorado Division of Minerals and Geology <br />Task #: 2 Permit/job#: C2009-87 <br />Date: 412912010 Abbreviation: <br />User: jhb Filename: C:tjhblTEAMIPeabody Sage Creek Mine\RCE\C2009-087 <br />Permitting action: New Application Source of unit costs: 2010 RS Means <br />Task description: Demolish structures at South facilites, remove materials and debris <br />_._ ___, __ ._._. _ ??.,w ..__.?__:.?_ •.___.. ,...__:_-----._ _ _ ?__:_:_._. _.__. ---;,_:_-_ ___. .? _.-----_--.-- -_- .__._>??__:--_---.---..__..._ ._____.._. -.._ --Last unit cost <br /> updat-__-_._.__....___. <br />e: 2010 <br />STRUCTURE or ITEM DESCRIPTION <br />(Dimensions in ft or cf unless noted) <br />15. Fueling stations 2 X 37.5 75 <br />16. Covered storage 5 buildings <br />a. west of portals 100 X 30 20 <br />b. South of portals 200 X 50 20 <br />c. South of portals 300 X 50 20 <br />d. South of portals 250 x 50 20 <br />e. North of portals 100 X 30 X 15 <br />f. concrete pylons 3.14 x 5 x 92 <br />17. Oil, MgCI,propane 8 liquids 37 x 112.5 X 20 <br />18. Powder magazines <br />19. Remove Culverts <br />SC-1 (HR A-2) <br />SC-2 (HR D) <br />SC-3 <br />SC-4 <br />SC-5 <br />SC-6 <br />SC-7 <br />SC-8 <br />SC-9 <br />18A <br />52A <br />53A <br />54A <br />55A <br />56A <br />59A <br />64A (no dia. given-est.) <br />2x 18.75 X 9X <br />CIRCES DEMOLITION MENU SELECTION <br />Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. hat <br />Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. ha <br />Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. ha <br />Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. ha <br />Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. hat <br />Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. hai <br />Demo. and on-site disposal in existing pit, 1.5 ft. x 2 ft. - Max. 200 ft. push <br />Remove sludge, water, and rem. product from tank - 3,000 to 5,000 gal. <br />8 Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. hat <br />QUANTITY <br />5,625 <br />60,000 <br />200,000 <br />300,000 <br />250,000 <br />45,000 <br />460 <br />1 <br />2,813 <br />UNIT UNIT COST TOTAL COST <br /> cf $ 0.27 $ 1,519 <br />556 cf $ 0.27 $ 16,200 <br />1,852 cf $ 0.27 $ 54,000 <br />2,778 cf $0.27 $ 81,000 <br />2,315 cf $ 0.27 $ 67,500 <br />417 cf $ 0.27 $ 12,150 <br /> 51 If $ 12.31 $ 5,663 <br /> ea. $ 221.00 $ 221 <br />26 cf $ 0.270 $ 759 <br /> If $ 11.89 $ 713.40 <br /> If $ 11.89 $ 2,235.32 <br /> If $ 11.89 $ 1,337.63 <br /> If $ 11.89 $ 951.20 <br /> If $ 11.89 $ 2,235.32 <br /> If $ 11.89 $ 1,117.66 <br /> If $ 11.89 $ 1,189.00 <br /> If $ 11.89 $ 1,783.50 <br /> If $ 11.89 $ 1,189.00 <br /> If $ 8.67 $ 433.50 <br /> If $ 6.87 $ 274.80 <br /> If $ 6.87 $ 274.80 <br /> If $ 8.67 $ 433.50 <br /> If $ 8.67 $ 433.50 <br /> If $ 8.67 $ 433.50 <br /> If $ 8.67 $ 433.50 <br /> If $ 11.89 $ 594.50 <br /> page subtotal= $ 255,075.35 <br />16,660 441 $ 3,426.01 <br /> direct cost total $ 753,338 <br />60 x 2 Pipe, corrugated metal (CMP) - 24 in. diameter pipe 60 <br />188 X 2 Pipe, corrugated metal (CMP) - 24 in. diameter pipe 188 <br />113 x 2 Pipe, corrugated metal (CMP) - 24 in. diameter pipe 113 <br />80 X 2 Pipe, corrugated metal (CMP) - 24 in. diameter pipe 80 <br />94 x 2 x 2 Pipe, corrugated metal (CMP) - 24 in. diameter pipe 94 <br />94 X 2 Pipe, corrugated metal (CMP) - 24 in. diameter pipe 94 <br />50 X 2 X 2 Pipe, corrugated metal (CMP) - 24 in. diameter pipe 50 <br />75 x 2 x 2 Pipe, corrugated metal (CMP) - 24 in. diameter pipe 75 <br />50 X 2 x 2 Pipe, corrugated metal (CMP) - 24 in. diameter pipe 50 <br />50 X 1.5 Pipe, corrugated metal (CMP) -18 in. diameter pipe 50 <br />40 x 1 Pipe, corrugated metal (CMP) -12 in. diameter pipe 40 <br />40 x 1 Pipe, corrugated metal (CMP) - 12 in. diameter pipe 40 <br />50 X 1.5 Pipe, corrugated metal (CMP) - 18 in. diameter pipe 50 <br />50 X 1.5 Pipe, corrugated metal (CMP) - 18 in. diameter pipe 50 <br />50 X 1.5 Pipe, corrugated metal (CMP) -18 in. diameter pipe 50 <br />50 X 1.5 Pipe, corrugated metal (CMP) -18 in. diameter pipe 50 <br />50 X 2 Pipe, corrugated metal (CMP) - 24 in. diameter pipe 50 <br />20. costs for concrete disposal=M104 X $7.77/Cy <br />cost adusted for location: =direct cost total'1.057 $ 796,278.33