Laserfiche WebLink
.......................................................................................................................................................................... <br />ROADARLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $47.34 1 $47.34 $47.34 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $47.34 $47.34 <br />.......................... <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time (hours) = 0.38 0.38 Total non-roadable mob/demob cost <br />Return time (hours) = 0.38 0.38 ' two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost `* <br />Unloading time (hours) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 1.75 0.75 <br /> <br />JOB TIME AND COST Total job time <br /> Total job cost <br />Grand Junction