My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-26_REVISION - M1996076
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1996076
>
2010-04-26_REVISION - M1996076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:24 AM
Creation date
5/7/2010 8:32:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996076
IBM Index Class Name
REVISION
Doc Date
4/26/2010
Doc Name
Reclamation costs update & notice of SI
From
DRMS
To
Rudolph Fontanari
Type & Sequence
SI2
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task #: 02a State : Colorado Permit/job #:M-1996-076 <br />Date <br />User <br />04/26/2010 <br />THM <br />County :Mesa <br />Site : Western Slope Flagstone <br />Abbreviation :none <br />Filename :M076-02a <br />yMVBlade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 22.00 acres Rip depth (ft) : 2.00 Volume : 70,987 BCY or CCY <br /> <br />Source of estimated quantity: Conditions observed during inspection <br />Source of estimated load factor : NA <br /> <br />lx q, XXX <br />HOURLY PRODUCTION <br />th <br />d Job Condition Correction Factors - <br />s - <br />o <br />Alternate me <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />roduction : <br />Unadjusted NA cu. yds./hour per selected method : 2,494.65 cu. yds./hour <br />p <br />Area : Avg. ripping depth : 2.00 feet/pass Site altitude:_ 5,100 feet <br />Average ripping width : 7.08 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 200.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />e dozer speed : <br />Avera 88.00 feet/minute Net job correction : 0.83 multiplier <br />g <br />Average maneuver time : 6.25 minutes/pass <br />Production per unit area : 0.773 acres/hour Adjusted unit production : 2,070.56 cu. yds./hour <br />Unadjusted production : 2,494.65 cu. yds./hour Adjusted fleet production : 2,070.56 cu. yds./hour <br /> <br />,:... <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) Total job time : 34.28 hours <br />Unit cost : $0.085 per cu. yd. Total job cost : $6,009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.