Laserfiche WebLink
Agency or organization name: DRMS <br />Permit or job action : SI-02 Final Reclamation Cost Update <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />01a <br />02a <br />03a <br /> <br />04a <br />05a -Re-grade 275 LF of 15' high hiighwall <br />-Rip 20 acres of pit floor and compacted area <br />-Replace 8" of topsoil over 22.5 acres of disturbance <br /> <br />-Revegetation of 22.5 acres disturbance <br />-Mobzation to and from site dozer <br />ripper <br />dozer <br /> <br />revege <br />mobilize 1 <br />1 <br />1 <br /> <br />1 <br />3 5.7 <br />34.2 <br />60 <br />1 <br />24.0 $932 <br />$6,009 <br /> <br />$9691 <br />$37,212 <br />" <br />2 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 127.71 $55,826 <br />* includes inflation factor adjustment of : NA % <br />INDIRECT COSTS <br />TOTAL DIRECT COST * ? $55,526 <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $1,128 <br />Performance bond : 1.05 % of direct total = $586 <br />Job superintendent : NA* NA NA total = NA <br />Profit : 10.00 % of direct total = $5,583 <br />* not required (or eqp. operator serves as super.) TOTAL O & P = $7,296 <br />LEGAL - ENGINEERING . PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) = $63,122 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $3,156 <br />CONTINGENCY - NA* NA total = NA <br />* contingencies accounted for at task level TOTAL INDIRECT COST = $10,453 <br /> TOTAL BOND AMOUNT (direct + indirect) _ $66,279