My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-04_REVISION - P2010007 (6)
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2010007
>
2010-05-04_REVISION - P2010007 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:37:39 AM
Creation date
5/7/2010 8:18:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010007
IBM Index Class Name
REVISION
Doc Date
5/4/2010
Doc Name
New modification application (non-confidential)
From
Rio Grande Silver, Inc.
To
DRMS
Type & Sequence
MD1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (Form 2 - Public) <br />3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Topsoil depth in the southern exploration area is estimated to range from zero to locally 12 inches. <br />VVI ie, ", p, ese, it, topsoil will be salvaged ai id stockpiled at the upslope side of the di ill pads. 0, me <br />the drill par] '.q rprnntni irPri and grarific the tnp.-,nil will hp rPdictrihlltpri near thp. final <br />graded areas. For reclamation purposes, it is assumed that approximately 4 to 6 inches of topsoil <br />will be available for redistribution as growing medium. <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />drill hnipe well hp ghandnnari in th?ir entirety All drill holes will he nom In etply filled with rnnrrete, <br />cement grout, or bentonite grout to prevent any vertical movement of groundwater within the drill <br />hole, as we as to eliminate a post-exp oration anger to people an wildlife tat may traverse the <br />area. The eanerete or grout will be p1seed 'bettern-tipward' in eaeh drill hele. Drill holes will be <br />plugged with a pre-cast or in-situ cement plug or bridge, starting at about 3 feet below the top of <br />the bedrock surface. The plug will ensure that any settlement of the concrete or grout in the hole <br />will no a ec the long-term effectiveness an integrity o the plugging procedure. opsol wl e <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Nnt annlicahle <br />T <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />Gates will be installed at the entrance to the temporary, low-standard access roads to close them <br />to motorized rave a the conclusion o the exploration program. Disturbed areas (roads and drill <br />disturbance. Compacted areas will be loosened as necessary by ripping or discing and left in a <br />roughened condition prior to topsoil replacement and reseeding. Reclamation will include the <br />Installation of water bars where necessary to prevent degradation of the reclaimed area.
The URL can be used to link to this page
Your browser does not support the video tag.