My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-04_REVISION - P2010007 (6)
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2010007
>
2010-05-04_REVISION - P2010007 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:37:39 AM
Creation date
5/7/2010 8:18:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010007
IBM Index Class Name
REVISION
Doc Date
5/4/2010
Doc Name
New modification application (non-confidential)
From
Rio Grande Silver, Inc.
To
DRMS
Type & Sequence
MD1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 (Form 2 - Public) <br />5. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />Two new drill pads (one drill pad from NOI P-2010-007 relocated; no new disturbance), each 0.2 acre in size. <br />Each diill pad will include up to thee dii" sunips, appiox !Olt x !Oft x 8 ft deep, to contain diiii cuttings. Dill <br />pads will be accessed by a total of 1.190 feet of temporary, low-standard roads. This NOI modification includes <br />an additional six HQ-size holes to be drilled using one or two drill rigs; each drill hole will be abandoned in its <br />enti,ety immediately on completion, i.e., only two hows upen at ally given . <br />6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 2 Average Width 100 (ft) Average Length 100 (ft) <br />B. Drill Holes: Quantity 6 Depth avg 1750 (ft) Diameter 6 (in) <br />C. Mud Pits: Quantity 6 Average Width 10 (ft) Average Length 10 (ft) <br />Average Depth 8 (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />None <br />D. Other Disturbances (please describe): <br />None. <br />E. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />No chemicals used or stored on site. An estimated 200 gallons of diesel fuel will be contained in <br />u drill rig. <br />F. New Road(s): Length 1,190 (ft) Width 15 <br />Significantly Upgraded Road(s) Length (ft) Width <br />Are culverts or other crossings proposed? If so, please describe: <br />No culverts or other crossings. <br />(ft) <br />(ft)
The URL can be used to link to this page
Your browser does not support the video tag.