Laserfiche WebLink
amen <br />Earth & Environmental <br />ATTACHMENT A <br />2010 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />PHASE 5 VLF <br />Name APR 11 APR 12 APR 13 APR 14 APR 15 APR 16 APR 17 <br />Joseph Hickey - PR - - - - - <br />Steve Rice - LS LS LS LS LS - <br />Mike Glass - LG LG LG LG LG - <br />Alfonso Frias - ST ST ST ST ST ST <br />Tyler Wendlandt* - ST ST ST ST ST <br />Bill Erickson* - ST ST ST ST ST <br />Benjamin Melly - GT GT GT GT GT - <br />Craig Thompson - GT GT GT GT GT GT <br />Madison Crouch - LT LT LT LT LT LT <br />John Lupo - - - - - - - <br />Derek Wittwer - - - - - - - <br />*Night Shift <br />LEGEND <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM = Field/ Laboratory Manager <br />VLF Weekly Report WE 04.17.10.1)