Laserfiche WebLink
8. Production Rates <br />The site's production volumes and rates can be seen below. An annual expected average and <br />maximum rate are shown. The life expectancy of the pit is based on this average rate. <br />Construction Materials Annual Production (Sellable Material) <br />Use Max Rate(tons) Average Rate(tons) Reject Rate(%) Raw Material(tons) <br />Asphalt 200,000 25,000 10% 27,777 <br />Aggregate 210,000 150,000 0% 150,000 <br />Concrete Aggregate 100,000 25,000 10% 27,777 <br />Totals 510,000 200,000 4% 205,555 <br />9. Schedule of Operations <br />The gravel pit hours of operation will be 6:00 a.m. to 8:00 p.m., Monday through Saturday and <br />8:00 a.m. to 1:00 p.m. on Sundays from March through November. The operating hours during the <br />December through February period will be 6:00 a.m. to 6:00 p.m. Monday through Saturday. <br />Overnight operation of an asphalt batch plant or concrete plant for public agency projects requiring <br />such activity, may be allowed subject to approval of the Board of County Commissioners in a <br />public meeting at least two weeks in advance of any proposed night time activity. The applicant <br />shall notify all adjacent property owners of such meeting by return-receipt mail at least 10 days <br />prior to the meeting and present the receipts at the meeting. <br />10. Mine Area Details <br />The expansion's reserves are divided into mining areas with each area having multiple phases. <br />Once a mining area's reclamation earthwork has been completed, pumping will cease and the pit <br />will be allowed to fill. This separation of areas and phases will limit the overall disturbed area. <br />Areas will be mined in sequential order. Many new commitments have been made for <br />contemporaneous reclamation, as described in the subsequent section. Mining Area details can be <br />seen below. <br />Scott Pit March 10 D-9