Laserfiche WebLink
<br />1 4( (a) {1) <br />120( )(I)(2) Soi <br />C <br />'cr?l7 <br />?(3) <br /> <br /> <br />4D IA,) <br />not available for comparison purposes, comparison of production on <br />disturbed areas shall be made with the re aroved <br />p.3 <br />accordance with 2.06.6(3)(g). <br />aggregate total prime farmland-acreage shall not be decreased from <br />w c existed prior to reining. Water bodies, if any, to b <br />ructed during mining and reclamation operations must be locate <br />(4) <br />'' the post-reclamation non-prime a an portions of the permit <br />The creation of any such water bodies must be approved by the <br />lion and the consent of all affected property owners within the <br />rea must be obtained. -=N <br />3 Soil Removal and <br />Unless exempted by Section 34-33-114(4)(b) of the Act, surface coal mining <br />o ratio for pri e f ds as identified in Section 34-33-110(2)(q) of the <br />A t be a d ed, mu ly with s I ! on for soil <br />r?movai, storag , ie ce nt, and r 0,, ctiQn to be blish by the <br />Secre?rys? the United States epartmto <br />ricu e, and th o r. hall <br />be required as mum to: <br />120(2)(g)(I)(1) Segregate the A'horiion 4 <br />other av le soil <br />product' e c pacity <br />the pe i thi <br />the natural so , ere it can be silo <br />materials wi . create a final soil ha i a gr <br />and, if not utilized immediately, s He w <br />s mate al sep from other soil mate ' s <br />177Q ):?r