My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-05_REVISION - C1981012 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2010-05-05_REVISION - C1981012 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:25 PM
Creation date
5/5/2010 1:25:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
5/5/2010
Doc Name
Letter, Application & Public Notice
From
New Elk Coal Company LLC
To
DRMS
Type & Sequence
TR53
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW ELK COAL COMPANY LLC <br />122 WEST FIRST STREET <br />TRINIDAD, CO 81082 <br />(719) 845-0090 <br />NEW ELK MINE <br />April 30, 2010 <br />Mr. Kent Gorham <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: New Elk Mine Permit C-81-012 <br />Permanent Development Waste Storage Area <br />Technical Revision-53 <br />Dear Mr. Gorham: <br />RE.C204,7M <br />0 5 2010 <br />Lltvl?tr.Kti o's tc?awl?:::??t1t, <br />Ron Thompson <br />Mine Superintendent <br />Attached please find a proposed technical revision to the New Elk Mine permit. New Elk <br />Coal Company (NECC) is proposing to permanently establish a Development Waste Disposal <br />Area (DWDA) south of Highway 12 in the area that is currently permitted as a raw coal <br />stockpile. This area is already disturbed and bonded. The waste material is expected to be <br />identical to material in the successfully reclaimed waste disposal area. The surface water <br />containment is established. <br />Specifically, NECC is requesting that the existing raw coal stockpile as shown on <br />permit Map 11 Surface Facilities and Roads East Portal be approved for permanent storage <br />of development waste. The capacity of the storage area is estimated at 72,100 BCY. The <br />overall pile height will be 30 ft tall. Each loft bench will be placed in up to 4 ft lifts and <br />compacted with a -track dozer. Setbacks of 22 ft for each bench will result in an overall slope <br />of 2.2:1. Map 11 is included with this submittal and has also been revised to show the <br />location where the temporary office and bathhouse trailers were set (installation approved by <br />MR-90.
The URL can be used to link to this page
Your browser does not support the video tag.