Laserfiche WebLink
Mike Boulay -7- March 3, 2008 <br />whichever is later (see 4.15.10(2)). Please provide a schedule for implementation of <br />the original wildlife habitat reclamation plan, to ensure compliance with Rule 4.13, <br />in the event that the alternative land use is not implemented within the applicable <br />2 year period. <br />SCC: Pages 6 and 10 of Figure 14-1 are enclosed and have been revised to provide a <br />schedule should the alternative land use not be implemented within the 2 year period. <br />15. Enclosed are amended pages 18-5 and 18-6 that indicate ground water <br />monitoring at the loadout will be discontinued upon approval of this permit revision and <br />the four monitoring wells will be sealed. <br />16. Please remove new appendix pages 13-1-65i, 14-6-18xxiv and revised appendix <br />pages ULT-1 through UTL-5v from the original application submittal dated July 6, 2007 <br />for they no longer apply. <br />Enclosed are the following new-or revised pages/drawings: <br />Volume 1: Revised Table of Content pages vi, viii and ix <br />Volume 5: Revised Tab 14 and Tab 15 Table of Contents, revised permit pages 14- <br />3, 14-9, 14-9i, 15-1, 18-5 and 18-6, new permit page 15-2, revised tables <br />14-1 and 14-2, revised pages 6 and 10 of Figure 14-1, new Figure 14-15, <br />new Appendix 15-2 pages A15-2-1 through All 5-2-19, and revised <br />Exhibits 10C, 11 C and 59 <br />Sincerely, <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: DRMS Denver, Mesa County Clerk, BLM, SCC File