My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-03_REPORT - C1980007 (9)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1980007
>
2010-05-03_REPORT - C1980007 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:12 PM
Creation date
5/3/2010 10:50:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REPORT
Doc Date
5/3/2010
Doc Name
2009 Subsidence Report
From
Wright Water Engineers, Inc
To
DRMS
Permit Index Doc Type
Subsidence Report
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fall 2009 Subsidence and Geologic Field Observations <br />Box Canyon, Apache Rocks, and South of Divide Mining Areas <br />of the south abutment of Monument Dam (Map D-3). At this location, it appears that there is <br />some additional movement occurring in the landslide as evidence by the linear feature that <br />extends southward from the borrow area toward the pre-existing head scarp. This feature, which <br />also contains two arcuate and linear intersecting traces, is in line with, and on the same trend as, <br />the shear zone mapped by Dunrud in 2005 (see Traverse Q-Q', pages 36-39 of the 2005 <br />subsidence report) and shown on Maps 3 and 4 of this report. MCC personnel have conducted <br />earthwork activities in the area since the time of the photograph (Map D-3) to install a french <br />drain to remove water from the upper end of the slide area southeast of the borrow site. <br />As of the time of the 2009 aerial photograph (Map D-3), mining of the first E-seam panel (Panel <br />E1) was approximately 40 percent complete with mining progressing from southeast to <br />northwest. <br />• <br />831-032.791 <br />April 2010 <br />Wright Water Engineers, Inc. <br />Page 14
The URL can be used to link to this page
Your browser does not support the video tag.