My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-30_APPLICATION CORRESPONDENCE - C2009087
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2009087
>
2010-04-30_APPLICATION CORRESPONDENCE - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:09:04 PM
Creation date
5/3/2010 9:33:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
APPLICATION CORRESPONDENCE
Doc Date
4/30/2010
Doc Name
Decision Extension Request (Emailed)
From
Peabody Energy
To
DRMS
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peabodq <br />Peabody Energy <br />Colorado Coal Resources, LLC <br />April 30, 2010 <br />Mr. Tom Kaldenbach <br />Environmental Protection Specialist <br />Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />-115C, M` <br />.14 a L r-. !'; R fop <br />xt' 4.,y? <br />?:lb?isaa?ra o? >aectta?r?,?tiran, <br />glt:np and 'Wel'l <br />C, 2- o 0? 0 a -7 <br />6?c e-? r-? <br />3001 W. Shamrell Blvd. <br />Suite 110 <br />Flagstaff, AZ 86001 <br />928 913-9205 <br />sec-al vra .e > <br />Re: Peabody Sage Creek Mine (C-2009-087) Request for Extension of the Preliminary Adequacy <br />Review Comment Period <br />Dear Mr. Kaldenbach: <br />Sage Creek Coal Company (SCCC) has completed all responses to the comments provided in the <br />Division's several Preliminary Adequacy Review documents for the Peabody Sage Creek Mine (PSCM) <br />Permit Application Package (PAP). SCCC understands that the Division is now completing the final <br />bond calculation estimate and the findings document for the PSCM PAP. <br />Regarding the Section -7 Consultation, if a final decision is not received from the USFWS and OSM <br />before May 7, it is requested that CDRMS stipulate receipt of the Section-7 Consultation as a condition <br />of the permit approval so that a timely proposed decision on the PSCM PAP can be issued by the <br />Division. <br />SCCC requests that the deadline for issuing a proposed decision for the PSCM PAP be extended to May <br />7, 2010 to allow sufficient time for the Division to complete the bond calculations and findings for a <br />timely decision on the PAP. <br />K you have any questions or need additional information regarding this request, please contact me as <br />soon as possible. <br />Sincerely, <br />Vern Pfannenstiel <br />Manager - Environmental Services West <br />Peabody Investment Corporation <br />cc: Brian Dunfee (PIC) <br />Jerry Nettleton (TMCC) <br />Scott Cowman (SCCC) <br />Mike Ludlow (SCCC)
The URL can be used to link to this page
Your browser does not support the video tag.