Laserfiche WebLink
Worst Case Reclamation Costs <br />Task Description Units Unit Cost($) Cost ($) <br />1 Backfill Portals 33 CY $ 13.50 $ 450 <br />2 Remove surface facilities $ 1,500.00 $ 1,500 <br />3 Installing sediment control system. 100 hrs $ 130.00 $ 13,000 <br />4 Ent Fencing 16 hrs $ 50.00 $ 800 <br /> <br />5 Ripping of disturbed ground mild <br />slopes less than 2H: IV. <br />1.25 ac. <br />$ 350.00 <br />$ 438 <br /> <br />6 Purchase of matting for fines spill <br />areas. <br />3,502 ft2 <br />$ 2.00 <br />$ 7,004 <br /> <br />7 Placement of matting on fines spill <br />area. <br />3,502 ft2 <br />$ 1.50 <br />$ 5,253 <br /> <br /> <br />8 Import of topsoil for 6 inches on <br />all disturned areas (excluding <br />marble block piles). <br /> <br />1,936 CY <br /> <br />$ 12.00 <br /> <br />$ 23,232 <br />8 Placement of topsoil. 1,936 CY $ 4.00 $ 7,744 <br /> <br />9 Broadcast seeding & mulching all <br />disturbed areas. <br />3.6 ac. <br />$ 1,200.00 <br />$ 4,320 <br />10 , Tree planting 75 trees $ 5.00 $ 375 <br />11 Shrub planting 75 shrubs $ 6.00 $ 450 <br />Subtotal $ 64,116 <br /> DRMS Administrative Costs 22% $ 14,105 <br />Total $ 78,221 <br />Maximum disturbance of the land is anticipated at the end of the mine life when the marble waste piles <br />have reached their maximum size. This will be a total disturbance area of 3.6 acres. However, the <br />amount of land to be re-vegetated is limited to a portion of the access roads on the surface of the waste <br />piles. <br />3. Post-Reclamation Site Drainage <br />The system of collection ditched and sumps will be left in place for final reclamation. These areas will <br />be seeded and mulched and will revegetate. As they eventually silt in, the site will be revegetated and <br />the system should not then be needed. Once mining is complete, drainage from the quarry will <br />commence when water has filled the existing workings up to the lowest possible exit elevation. This is <br />the north portal. Water exiting the north portal will continue down the access road. <br />Yule Quarry April 10 36