My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-30_REVISION - M1999058
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999058
>
2010-04-30_REVISION - M1999058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:22:42 PM
Creation date
4/30/2010 1:21:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999058
IBM Index Class Name
REVISION
Doc Date
4/30/2010
Doc Name
New amendment application (AM-01)
From
Colorado Stone Quarries, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
GRM
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drainage Basin Run-off Calculations and Sump Designs <br />All ditch and sump designs are based on the 10 year 6 hour storm event of 1.6 inches, as determined <br />from the NOAA Atlas 2 Volume III Isopluvial Map.The granular nature of the sump materials will <br />allow infiltration of the water in the ground within 48 hours. This is based on existing site experience at <br />the mine. <br />For this reason, the sumps have no principal spillway but have an emergency spillway of 3 feet width <br />and 1 feet depth with 2H:1 V sideslopes. The emergency spillways will be lined with 6" size durable <br />rock. <br />Any berms needed for the sumps will be no greater than 2 feet high and will be constructed of earth fill <br />that will prevent water seepage when compacted to 90% maximum dry density, which will be achieved <br />with these berms. <br />The NPDES discharge permit is being modified to contain the discharge points for all 5 basins as well as <br />the water pumping from the South Portal, as shown on Map C-2. <br />All watershed basin areas have been calculated in CAD and are shown on Map C-2. <br />All of the following calculations were performed in the hydrology module in Carlson engineering <br />software working in Autocad. <br />Yule Quarry April 10 19
The URL can be used to link to this page
Your browser does not support the video tag.