Laserfiche WebLink
falling high mountain stream. It drops approximately 600 feet from the southern end of the New <br />Discovery claim to the northern end of the White Marble claim. Based on the drainage area, Yule <br />Creek, where it joins the Crystal River at Marble, is estimated to have a mean flow of 42 and 76 cubic <br />feet per second during May and June respectively. <br />The underground portions of the quarry receive water from faults in the marble, primarily in early <br />summer. This water is generally retained within the settling sumps in the quarry. But during high <br />runoff periods, some water discharge will be pumped from the sumps. The quality of the water in the <br />sumps has been monitored periodically by the Colorado Department of Health. Records indicate no <br />water quality problems and none are expected in the future. CYMC operated the quarry under Permit <br />No. CO-G-500184 issued by the Colorado Department of Health. Sierra Minerals Corporation operated <br />the quarry under a new Process Water and Stormwater permit from that agency. Polycor - Colorado <br />Stone Quarries, Inc. now operates the quarry under Permit No: M-1999-058. The maximum flow from <br />the quarry is estimated at 100 gpm (0.16 cfs) during the high flow season, so there should be no <br />noticeable impact on Yule Creek from such discharge. <br />The primary non-potable water use at the quarry is for cooling, dust control and flushing of the saw <br />cuttings from the diamond wire saw and chain saw. 6 diamond saws and two chain saws are used for the <br />production. Each saw consumes an average 5 gallons of water a minute. Three development gallery <br />saws are operated dry and consume no water. This rate is not consumptive since the water is reused from <br />settling ponds and sumps in the quarry. Water from seepage into the quarry from surrounding formations <br />is the source of this circulating, non-potable water requirement. Past experience indicates that the quarry <br />generates excess water in the sumps during spring runoff periods. At these times, some water needs to <br />be discharged. Potable water is brought to the site as required. Sanitary waste facilities are portables <br />toilets and do not require water. <br />There has been no significant effect on the quantity and quality of ground water or surface water from <br />CYMC or Sierra past operations and Colorado Stone has not noticed any from its operations. The <br />fracture zone from which the water is seeping is limited to a 50 to 80 feet zone close to surface (apex) <br />and even if Colorado Stone is forecasting four times more production than the previous operator, no <br />Yule Quarry April 10 8