Laserfiche WebLink
Exhibit A <br />6.3.1 1) the map now reflects all land owner (Red Mountain Open Spaces) on revised <br />map <br />Exhibit B <br />622 2)I James Theisen Owns The Mme€al Rights to The Following Property, Parcel # <br />91064 O"19 Legal D on_ All M/R IN W 'h, OF SW V4, E %z OF NW Y4, <br />NEY0FSWV,NYZ OF SE %, SE % 6-11-69 <br />Exhibit C <br />6.3.3 4) The average depth of top soil to- be stored in stock pile will be 6-12 inchcs <br />5) Top soil stockpile will be seeded at lease onm a year as per Red Mountain <br />Open Spaces requirements <br />6) No bench work will be done on site <br />7) lb.,-. Army Core of Engineers Does Not Feel A. Permit is required, as per there <br />Letter Dated March 5`h 2010 <br />. ; k: aiab tar - iH be cored not coved. The cores are taken with a drill from <br />- t.- -I 3 <br />Rock taken from the quarry. <br />9) The primary commodity is Alabaster. At this time there is no second <br />Commodity <br />Exhibit D <br />6.3.4 10)11)12)13) <br />The reclamation will be done as follows: <br />.: X --3; t 11= sbastcr the hale will be filled in and graded and then seeded <br />as behind . As per reseeding and grade eirts <br />Exhibit Map E <br />6?A 14)15)16))17)18) <br />Please see Revised Map Marked Exhibit E <br />Exhibit F <br />6.3.6 <br />19) 1 have € ontacted the state and county planner and told me there will be no <br />Other permits required. For I._ __ -14 V <br />Larimer c ouffty Planner (WW,, 4:X&-5- 7 t 11 <br />:r