My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-30_HYDROLOGY - M1977572
>
Day Forward
>
Hydrology
>
Minerals
>
M1977572
>
2010-04-30_HYDROLOGY - M1977572
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:09:26 PM
Creation date
4/30/2010 9:14:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977572
IBM Index Class Name
HYDROLOGY
Doc Date
4/30/2010
Doc Name
Mining operations with exposed ground water letter
From
DRMS
To
Valco, Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Division has identified four approaches for operators: <br />1. File a financial warranty that will ensure backfilling of the pit to cover the exposed ground water to a <br />depth of two feet above the static ground water level or, <br />2. Obtain a court approved augmentation plan prior to exposing ground water or, <br />3. File a financial warrantyto cover the cost of installing a clay liner or slurry wall that meets the <br />Division of Water Resources requirements for preventing ground water exposure or, <br />4. Obtain approval from the Division of Water Resources that acknowledges compliance with the SEO's <br />requirements pursuant to § 37-90-137(11). <br />The Division will work with operators on an individual basis as they move to implement one of these plans. It <br />is likely that options 1 and 3 will require the submittal of a technical revision or an amendment to the existing <br />permit depending on the nature of the current mining and reclamation plan and the proposed changes. <br />Increased financial warranties, as a result of these modifications, may be posted in a phased manner not to <br />exceed three years. Amendments or revisions currently under review will be required to be approved by <br />April 30, 2011 and may use the phased financial warranty approach described above. New applications going <br />forward or presently under review by the Division will be required to meet the requirements of one of the <br />options 1-4 at the time of application approval. Failure of affected operators to initiate contact with the <br />Division and gain compliance as described above could result in an enforcement action being issued by the <br />Division. <br />If you have any questions, please contact Tony Waldron at 303-866-3567, extension 8150. <br />cc: M1977559 Canon City East Pit <br />M1977560 Rocky Ford East Pit <br />M1977572 Lamar East Pit <br />M1977222 Rocky Ford South Pit
The URL can be used to link to this page
Your browser does not support the video tag.