Laserfiche WebLink
p t c?R' <br />Go A At -?rd AA <br />?MN ai MaYpa? M-1g0I-I£?? <br />DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER ?RRCES <br /> Bill Ritter, Jr. <br />R ? 9 204 <br />A Governor <br />P James B. Martin <br />Division (A rcTCl="On, Executive Director <br />Minft and SzfttY Dick Wolfe, P.E. <br /> Director/State Engineer <br />Response to Reclamation Permit Amendment Application Consideration <br />DATE: April 16, 2010 <br />TO: Wallace H. Erickson, Environmental Protection Specialist CC: Division 7 Office; District 33 Water Commissioner <br />FROM: Melissa A. Peterson, P.E. ;j 6 <br />fs o ngo <br />RE: May Day Mine, File No. M-1981-185 ?q; n of I%Y <br />Contact: George is nrn9 a/7 Sa ©a on <br />Robinson tY <br />Section 28, Twp 36N, Rng 11 W, N.M.P.M., La Plata County <br />CONDITIONS FOR APPROVAL <br />? The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />® The proposed operation will consume ground water by: ® evaporation, ? dust control, <br />? reclamation, ® water removed in the mined product, 9 processing, ? other:. <br />? Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />? Other: <br />COMMENTS: The mine owners have a court decreed water rights and augmentation plan, Case No. <br />06CW91. This decree allows the diversion of up to 1.0 cfs from the Idaho Mill Diversion, conditional <br />storage rights in Wildcat Augmentation Ponds #1 and #2 (3.0 and 2.5 acre-feet storage respectively), and <br />the Idaho Mill Settling Pond (1.5 acre-foot). The augmentation plan allows the stored water in the Wildcat <br />Augmentation Ponds to be released to the La Plata River for augmentation purposes. If there is a river call <br />and insufficient water remains in the augmentation ponds for replacement, all diversions will cease and the <br />project will use recycled water from the Idaho Mill Settling Pond. The Division 7 Office and the District 33 <br />Water Commissioner will monitor all diversions and replacements to the La Plata. <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303-866-3581 • Fax: 303-866-3589 <br />www.water. state.co. us