My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-26_PERMIT FILE - P2010006
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2010006
>
2010-04-26_PERMIT FILE - P2010006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:08:45 PM
Creation date
4/28/2010 4:05:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010006
IBM Index Class Name
PERMIT FILE
Doc Date
4/26/2010
Doc Name
New NOI Application Form 2
From
Savage Mining
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />7 (Form/ ' <br />filiflg)7. List the seed mixture to be used in the re-establishment of vegetation. See the attached seed mixture calculation to obtain <br />PLS/acre. For assistance with formulating seed mixtures and rates, contact the local NRCS if on private land, BLM/USFS if <br />on public land or State Land Board if on state land. <br />A. Provide plant name and seeding rate <br />Plant Name acre) <br />Seeding Rate (PLS/ <br /> /? <br />// 0/ ef- <br /> IS- Pe-Placr_c- <br />o r\O . -25c, G 2S Z a ,e A <br />LS' '6( (C' c o olr? . 1- _ > <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />)fe_.? <br />V. TERMS AND CONDITIONS FOR PROSPECTING OPERATIONS: <br />1. Reclamation measures shall be fulfilled in a timely manner and completed within five (5) years of completion of prospecting <br />activities. <br />2. The prospecting operations described in this Notice will be conducted in such a manner as to minimize surface disturbances. <br />In addition to the measures required in Rule 5, precautions to be taken include: <br />A. Confinement of operations to areas near existing roads or trails, where practicable. Existing roads which are to remain as <br />permanent roads after prospecting activities are completed shall be left in a condition equal to or better than the pre- <br />prospecting condition; <br />B. Drilling shall be conducted in such a way as to prevent cuttings and fluids from directly entering any dry or flowing <br />stream channel. Drill cuttings must be spread to a depth no greater than one-half (1/2) inch or buried in an approved <br />disposal pit; <br />B. Describe the method for seed bed preparation, and application method for grass/forb seeding:
The URL can be used to link to this page
Your browser does not support the video tag.