Laserfiche WebLink
-4- <br />12. Prima future Post-minim land use check one : <br />U Cropland(CR) F]Pastureland(PL) <br />1 `' 1 Rangeland(RL) -E]Forestry(FR) <br />Residential(RS) n Recreation(RC) <br />Developed Water Resources(WR) <br />13. Primary Dresent land use (check one): <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />B Residential(RS) F Recreation(RC) <br />Developed Water Resources(WR) <br /> General Agriculture(GA) <br /> Wildlife Habitat(WL) <br /> industrial/Commercial(IC) <br />F-1 Solid Waste Disposal(WD) <br /> General Agriculture(GA) <br /> Wildlife Habitat(WL) <br /> <br />I_I Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Front end loaders, dozers, backhoes, dump trucks and conveyor belts. <br />15. On Site Processing: _V l Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Front end loaders, dozers, backhoes, dump trucks and conveyor belts. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />New Application